Blackstairs GWS reducing its carbon footprint

Those who attended the official unveiling of the DWR Uisce 'Pump as Turbine' pilot project at Blackstairs GWS on the 2nd May 2019.

Blackstairs GWS is reducing its electricity bill by 20% following the installation of the power-generating Pump as Turbine (PAT) on its network.  Read the full story on page 14 in the 2019 Summer issue of the  RWN magazine.